Quality & Manufacturing

Controlled Ozone Generator Manufacturing

Quality begins with an agreed specification: feed gas, gas flow, ozone output, concentration, cooling, electrical input and operating duty.

Traceable Requirements

We test against defined operating conditions

A single ozone-output number is not enough to evaluate a generator.

Output and concentration vary with oxygen purity or air preparation, dew point, gas flow, temperature, cooling and discharge-cell condition. For this reason, technical confirmation should record the test conditions and measurement approach, especially for OEM and repeat-order projects.

Core verification points

  • Visual and assembly inspection
  • Gas-path and connection check
  • Electrical safety and functional operation
  • Ozone performance under specified conditions
  • Cooling, alarm and control-interface operation
  • Label, accessory and packaging confirmation
Manufacturing Flow

Inspection from incoming parts to final packing

Incoming Check

Critical parts, power components, discharge assemblies and mechanical items are checked against purchasing requirements.

Assembly Control

Gas connections, wiring, mounting and cooling paths follow the approved product configuration.

Functional Test

Electrical operation, ozone generation and agreed control functions are checked before release.

Final Release

Appearance, labels, accessories, documentation and protective packaging are confirmed.

What Buyers Should Request

Evidence should match the actual model and application

Technical Data

Ask for conditions behind output claims, including feed gas, flow, concentration and measurement method.

Compliance Scope

Confirm that any certificate, report or declaration covers the specific model, voltage and intended market.

Change Control

For repeat supply, define which components, interfaces or performance parameters require buyer approval before change.

Project Documentation

Documentation is agreed by project scope

Available information may include specifications, outline drawings, wiring or connector definitions, inspection records and packaging details.

Important: Final-system safety, validation and regulatory approval remain the responsibility of the equipment integrator and the party placing the completed equipment on the market.

Need a quality plan for an OEM order?

Tell us the model, annual quantity, critical parameters and documentation requirements.